摘要 本文研究的安九铁路AJSG-I标龙山二号隧道为标段控制性工程,起迄里程ZD1K16+605~ZD1K21+490,全长4885m,隧道最大埋深约252m。结合监控量测点布设、测量方法和数据处理分析研究如何判定围岩稳定性,为后续的二次衬砌施工提供数据支撑。 The AJSG-I Longshan No.2 Tunnel of Anjiu Railway is a control project of the bidding section,with the starting and ending distance of ZD1K16+605~ZD1K21+490,the total length of which is 4885m,the maximum buried depth of the tunnel is about 252m,and the monitoring measurement points are arranged How to determine the stability of surrounding rock and provide data support for the subsequent secondary lining construction.
作者 刘战彪 LIU Zhan-biao(The 3rd Engineering Co.,Ltd.of China Railway 17 Bureau Group Corporation,Shijiazhuang 050081,China)
出处 《价值工程》 2021年第20期120-123,共4页 Value Engineering
关键词 龙山二号隧道 监控量测 净空收敛 拱顶沉降 回归分析 Longshan tunnel 2 monitoring measurement clearance converge crown settlement analysis of regression
  • 相关文献

参考文献2

二级参考文献2

共引文献26

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部