摘要
昆明瀑布公园位于昆明市盘龙区北部山水新城核心区,该片区的规划主要依托牛栏江-滇池补水工程的引水,瀑布公园上池防渗是昆明瀑布公园湿地景观成败的保障,选择合适合理的防渗方案是昆明瀑布公园设计的成败的关键,关乎整个工程及昆明市北部山水新城的形象面貌。介绍牛栏江引水工程盘龙江入口段防洪工程(昆明瀑布公园)防渗方案比选过程。根据工程的特点,因地制宜选择合理的防渗方案,取得较好成效。
Kunming Waterfall Park is located in the core area of Shanshui New Town,the north of Panlong District of Kunming City.The planning of this area mainly relies on the diversion of Niulanjiang-Dianchi Lake water compensation project.The seepage prevention of the upper pool of Waterfall Park is the guarantee for the success or failure of the wetland landscape in Kunming Waterfall Park.The key to the design of Kunming Waterfall Park is to select a reasonable seepage prevention scheme.It concerns the whole project and the image of the new mountain and water city in the north of Kunming.The comparison and selection process of seepage control schemes for flood control project(Kunming Waterfall Park)at Panlong River inlet section of Niulanjiang diversion project is introduced.According to the characteristics of the project,a reasonable seepage control scheme is selected according to local conditions and good results are achieved.
作者
桂重
郑小芳
GUI Chong;ZHENG Xiao-fang(Power China Kunming Engineering Corporation Limited,Kunming 650051,China)
出处
《云南水力发电》
2021年第7期109-112,共4页
Yunnan Water Power
关键词
昆明瀑布公园
防渗
混凝土防渗
黏土防渗
复合土工膜防渗
Kunming Waterfall Park
seepage prevention
concrete seepage prevention
clay seepage prevention
composite geomembrane seepage prevention