期刊文献+

新疆某水库枢纽工程大坝填筑施工技术分析 被引量:4

Analysis on Dam Filling Construction Technology of a Reservoir Project in Xinjiang
下载PDF
导出
摘要 大坝作为水库主体结构的重要部位是施工中的重难点,根据施工规范及该工程的设计特点,提出水库大坝填筑的施工方案,对填筑坝体关键工序及重点部位的施工处理进行分析研究,明确了施工程序,同时,为保证施工质量,提出大坝填筑相关质量控制要素,防范可能出现的质量病害和安全隐患,切实保障大坝质量和施工安全。 As an important part of main structure of reservoir,dam is a heavy and difficult problem in construction.According to the construction specifications and the design characteristics of the project,this paper puts forward the construction scheme for dam filling of reservoir,analyses and studies the construction treatment of key procedures and key parts of the dam body,and defines the construction procedure.At the same time,in order to ensure the construction quality,this paper proposes relevant quality control elements for dam filling to prevent potential quality diseases and safety hazards,and to effectively guarantee the dam quality and construction safety.
作者 刘玉杰 LIU Yu-jie(Xinjiang Tarim River Basin Authority,Korla 841000,China)
出处 《云南水力发电》 2021年第7期177-180,共4页 Yunnan Water Power
关键词 水库工程 大坝填筑 施工技术 控制要素 reservoir project dam filling construction technology control element
  • 相关文献

参考文献6

二级参考文献18

共引文献26

同被引文献21

引证文献4

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部