期刊文献+

Construction technology on pile foundation of No.6 main pier in Dashengguan Yangtze Bridge

原文传递
导出
摘要 Based on pile foundation construction of No.6 main pier,deep mudstone geological foundation and deep-water construction in Nanjing-Dashengguan Yangtze Bridge,the method of super-large-diameter bored pile in deep water is studied.The spread drill,application of PHP mud,and choice of machine are solved by adopting two machines of KTY4000 and KPG300A.Besides,the airlift reversing circulation is selected in slag discharge.The results show that this method can ensure successfully the construction of pier foundation to satisfy the demands of codes.
出处 《Frontiers of Structural and Civil Engineering》 SCIE EI 2009年第3期339-343,共5页 结构与土木工程前沿(英文版)
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部