摘要 The dam heightening,which is an effective way to increase reservoir volume,has been paid close attention by engineers.Three problems should be dealt with when an arch dam needs to be heightened:stress state getting worse at dam heel,cracking on new added concrete dam surface,and weak bonding between new added concrete and old dam.Taking Geba arch dam as an example,these problems are examined in details through simulation analysis by the finite element method.The tensile stresses on dam’s surface and joint face that have certain relations to the dam heightening can be controlled by some measures.
出处 《Frontiers of Structural and Civil Engineering》 SCIE EI 2011年第1期98-104,共7页 结构与土木工程前沿(英文版)
  • 相关文献

参考文献3

二级参考文献13

  • 1朱伯芳,1989年
  • 2朱伯芳,水力发电,1988年,8期
  • 3团体著者,混凝土拱坝设计规范,1985年
  • 4朱伯芳,有限单元法原理与应用,1979年
  • 5朱伯芳,水力发电学报,1994年,3期
  • 6朱伯芳,水工结构与固体力学论文集,1988年
  • 7朱伯芳,水利学报,1985年,9期
  • 8朱伯芳,水利学报,1983年,5期
  • 9朱伯芳,有限单元法原理与应用,1979年
  • 10朱伯芳,水工混凝土结构的温度应力与温度控制,1976年

共引文献66

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部