摘要
以煤矿综采工作面的设备安装回撤问题为研究对象,分析了相关工作存在的问题和不足,探讨了液压支架、刮板输送机及采煤机的安装工艺要点,以及关键设备、带式输送机、液压支架、转载机等设备回撤策略和注意事项,以期为相关从业者提供参考。
With the problem of equipment installation of coal mine,the problems and deficiencies are analyzed and the installation technology of hydraulic support,scraper conveyor and coal miner are discussed.Finally,the withdrawal strategies and precautions of key equipment,belt conveyor,hydraulic support,reprint machine and other equipment are discussed to provide reference for relevant practitioners.
作者
苏凯华
Su Kaihua(Datong Coal Mine Group Installation Branch Co.,Comprehensive Mining Equipment,Ltd.,Datong Shanxi 037000)
出处
《机械管理开发》
2021年第7期301-302,304,共3页
Mechanical Management and Development
关键词
综采工作面
设备安装
设备回撤
comprehensive mining working face
equipment installation
equipment pullback