期刊文献+

The Rion-Antirion bridge—when a dream becomes reality 被引量:7

原文传递
导出
摘要 Opened to traffic in August 2004,the RionAntirion Bridge crosses the Gulf of Corinth near Patras in western Greece.It consists of an impressive multi cablestayed span bridge connected to the land by two approaches.An exceptional combination of physical conditions made this project quite unusual:high water depth,deep strata of weak soil,strong seismic activity and fault displacements.In addition a risk of heavy ship collision had to be taken into account.The structure has been designed in view of challenging severe earthquakes and ensuring the everyday serviceability of the link as well.To make the bridge feasible,innovative techniques had to be developed:The strength of the in situ soil has been improved by means of inclusions;the bridge deck has been suspended on its full length,and therefore isolated as much as it can be.
机构地区 [
出处 《Frontiers of Structural and Civil Engineering》 SCIE EI 2011年第4期415-426,共12页 结构与土木工程前沿(英文版)
  • 相关文献

同被引文献62

引证文献7

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部