煤巷掘进过构造带施工技术优化研究 被引量:2

Study on Construction Technology Optimization of Coal Roadway Driving through Structural Zone
下载PDF
导出
摘要 华阳五矿局部发育陡倾挠曲、陷落柱发育,在掘进过程中极易出现煤岩层破碎、瓦斯地质异常等现象,对现有的煤巷掘进过构造施工方案进行了优化,采用了全新的施工工艺和支护技术方案,将支护效率提高40%,支护成本降低9.8%。 In Huayang No.5 Coal Mine,steep deflection and collapse columns are developed locally,and coal and rock strata are easily broken and gas geological anomaly occurs in the process of tunneling.The existing construction scheme of coal roadway tunneling structure is optimized,and the new construction technology and support technology scheme are adopted,which improves the support efficiency by 40%and reduces the support cost by 9.8%.
作者 赵志龙 Zhao Zhilong(The Fifth Mine of Huayang New Material Technology Group Co.,Ltd,Shanxi Yangquan 045000)
出处 《山东煤炭科技》 2021年第7期7-9,共3页 Shandong Coal Science and Technology
关键词 构造带 掘进 支护 structural zone driving support
  • 相关文献

参考文献4

二级参考文献37

共引文献42

同被引文献6

引证文献2

二级引证文献5

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部