摘要
本文针对特大城市轨道、公交、慢行三网融合实施方案进行了研究,探讨了三网融合的发展目标与策略,三网融合实施方案的编制原则、编制内容等,并以深圳市白沙岭、红荔片区为例进行了案例分析。本文的研究成果可为相关特大城市的轨道、公交、慢行三网融合项目的实施提供参考,也可为相关工程技术人员、科研人员提供有益借鉴。
This paper explores the development goals,strategies,and the implementation plan for the integration of three networks of rail,public transportation and slow traffic in mega-cities.The principles and content of the implementation plan for the integration of three networks,are discussed.The Baishaling and Hongli districts of Shenzhen are taken as an example.The research results of this paper can provide reference for the implementation of the integration of rail,public transport and slow traffic in the relevant mega-cities,and can also provide useful reference for related engineering and technical personnel and scientific researchers.
作者
吴乐
罗俊
刘鼎
WU Le;LUO Jun;LIU Ding(Shenzhen Urban Transport Planning and Design Institute Co.,Ltd.,Shenzhen 518055,China)
出处
《价值工程》
2021年第21期13-15,共3页
Value Engineering
基金
教育部科技发展中心产学研创新基金(2018A01025)
深圳市哲学社会科学规划课题(SZ2019C004)。
关键词
轨道
公交
慢行
三网融合
深圳
rail
public transportation
slow traffic
triple play
Shenzhen