期刊文献+

招标阶段工程量清单及控制价编制要点浅析

Analysis on the Main Points of the Preparation of the Bill of Quantities and the Control Price in the Bidding Stage
下载PDF
导出
摘要 目前,我国大多数的建设项目都是引用工程量清单来进行招标和计价。所以,招标清单在编制过程中主要是对工程招标价格做出合理控制,同时也会对投标报价及工程项目竣工后的结算价带来一定影响。对施工项目来讲,招标清单和控制价编制,既可以构建公平公正的平台,又能为建设单位工程造价控制提供一定便捷,应对其给予足够重视。 At present,most of the construction projects in China use the bill of quantities for bidding and pricing.Therefore,the bidding list is mainly to make reasonable control of the project bidding price during the compilation process,and it will also have a certain impact on the bid quotation and the settlement price after the completion of the project.For construction projects,the compilation of bidding lists and controlled prices can not only build a fair and just platform,but also provide a certain degree of convenience for the construction unit's project cost control,which should be given sufficient attention.
作者 丁友慧 DING You-hui(Jiangsu Jianda Whole Process Engineering Consulting Co.,Ltd.,Nantong 226600,China)
出处 《价值工程》 2021年第21期28-30,共3页 Value Engineering
关键词 招标阶段 工程量清单 编制要点 bidding stage engineering quantity list compilation points
  • 相关文献

参考文献5

共引文献28

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部