期刊文献+

考虑隧道开挖与桩基相互作用的大底盘塔楼建筑变形分析 被引量:5

Analysis on deformation of tower with large chassis considering interaction between tunnel excavation and pile foundation
下载PDF
导出
摘要 采用两阶段分析方法研究隧道开挖与大底盘塔楼建筑桩基相互作用对大底盘塔楼结构的影响.首先,计算出隧道开挖诱发的地层位移和附加荷载;然后,采用子结构刚度凝聚法将上部大底盘塔楼建筑刚度凝聚至下部桩基础,得到大底盘塔楼结构的内力及变形.建立上部结构形式为大底盘塔楼结构和普通梁结构的2种计算模型,基于桩基数量、隧道埋深及隧道水平位置,对其上凸与下凹变形进行分析.结果表明,当隧道埋深与桩长之比小于2.5时,宜采用大底盘塔楼结构模型计算;当隧道埋深与桩长之比大于2.5时,宜采用梁结构模型计算.当隧道处于不同水平位置时,大底盘塔楼结构模型的上凸下凹变形均小于梁结构模型变形.桩基数量对梁结构、大底盘塔楼结构模型上凸下凹变形影响最弱. A two-stage method was used to investigate the influence of the interaction between tunnel excavation and pile foundation on the structure of a tower with large chassis.Firstly,the ground displacement and the additional load induced by tunnel excavation were calculated.Then,by the substructure stiffness cohesion method,the structural rigidity of the upper large chassis tower was condensed to the pile foundation.The internal force and deformation of the tower with large chassis were obtained.Two models for the large chassis tower structure and the beam structure were established according to the superstructure form.The hog and sag deformations of the large chassis tower structure model and the beam structure model were analyzed based on the number of piles,the depth of the tunnel and the horizontal position of the tunnel.The results show that when the ratio of the buried depth of the tunnel to the pile length is less than 2.5,the large chassis tower structure model is suitable for calculation.When the ratio of the buried depth of the tunnel to the pile length is more than 2.5,the beam structure model should be used.When the tunnel is at different horizontal positions,the hog and sag deformation of the large chassis tower structural model is smaller than that of the beam structure model.The number of the piles has the weakest influence on the hog and sag deformations of the beam model and the large chassis tower model.
作者 张治国 李振波 张孟喜 张瑞 马少坤 潘玉涛 Zhang Zhiguo;Li Zhenbo;Zhang Mengxi;Zhang Rui;Ma Shaokun;Pan Yutao(School of Environment and Architecture,University of Shanghai for Science and Technology,Shanghai 200093,China;Department of Civil Engineering,Shanghai University,Shanghai 200444,China;Department of Civil and Environmental Engineering,National University of Singapore,Singapore 117576,Singapore;School of Civil Engineering and Architecture,Guangxi University,Nanning 530004,China)
出处 《东南大学学报(自然科学版)》 EI CAS CSCD 北大核心 2021年第4期603-609,共7页 Journal of Southeast University:Natural Science Edition
基金 国家自然科学基金资助项目(41772331,41977247).
关键词 大底盘塔楼建筑 隧道开挖 上凸下凹变形 刚度凝聚法 tower with large chassis tunnel excavation hog and sag deformations stiffness cohesion method
  • 相关文献

参考文献16

二级参考文献188

共引文献298

同被引文献42

引证文献5

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部