23051底抽巷掘进影响因素分析及优化 被引量:1

Analysis and Optimization of Influencing Factors in Excavating at Bottom Drainage Roadway
下载PDF
导出
摘要 为提高底抽巷单进水平,保证矿井采掘正常接替,通过分析制约23051底抽巷快速掘进的各类因素,认为机械化程度、运矸系统、爆破功效是制约巷道掘进效率的主要因素,并对制约因素中的掘进装备、运矸系统以及爆破工艺进行优化,优化后掘进影响时间由8天减少至2天,日进尺由3.2 m增加至5.7 m,月进尺由70 m提高至160 m,单进水平得到大幅提高。 To improve the the level of per unit tempo and ensure the normal relay of coal mining,the authors presents the the main factors restricting the excavation efficiency,such as mechanization,gangue transport system and blasting effect by analysis of factors restricting rapid excavation at 23051 bottom drainage roadway and proposes the optimization of excavation equipment,gangue transport system and blasting technique,which can reduce the excavation effect time from eight days to two days,and increase the daily drilling progress from 3.2 m to 5.7 m,monthly from 70 m to 160 m with dramatic increase of per unit tempo.
作者 张国宝 Zhang Guobao(Dongda Colliery,Shanxi Qindong Energy Co.,Ltd.,Qinshui,Shanxi 048200)
出处 《江西煤炭科技》 2021年第3期32-34,共3页 Jiangxi Coal Science & Technology
关键词 底抽巷 快速掘进 制约因素 优化 bottom drainage roadway rapid excavation constraining factors optimization
  • 相关文献

参考文献5

二级参考文献11

共引文献287

同被引文献7

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部