复杂工况在安全保护区的叠加影响控制分析

Control Analysis on Superimposed Influence of Complex Operating Conditions in Safety Protection Area
下载PDF
导出
摘要 陆翔路-祁连山路贯通工程Ⅱ标段(K2+160.0~K3+265.15)是一项包含了顶管、基坑、桥梁、道路和排水的综合性工程,其北侧的路堤桥、基坑及部分顶管工程在运营轨交7号线及在建15号线50 m安全保护区内,距离7号线病害段最近距离6.1 m,距离15号线车站最近距离1.7 m。针对多个工况对临近轨交可能产生扰动的施工影响因素进行了分析,阐述了施工过程中针对这些影响所采取的保护性措施,并结合监测数据分析,总结施工过程中出现的问题和控制要点,给出了在轨交安全保护区施工的建议。 Luxiang Road-Qilianshan Road Link-up Project Section II(K2+160.0~K3+265.15)is a comprehensive project including the pipe jacking,foundation pit,bridge,road and drainage.The embankment bridge,foundation pit and partial pipe jacking works at it north side are all in 50-m safety protection areas of Metro Line 7 under operation and Metro Line 15 under construction,and are 6.1m from the nearest distance of the disease section of Metro Line 7 and are 1.7 m from the nearest distance of Metro Line 15 Station.The influencing factors of many construction conditions possibly on the adjacent rail traffics are analyzed.The protective measures taken for these influencing factors in the construction are set forth.Combined with the analysis of monitoring data,the existing problems and the control essentials in the construction are summarized.The suggestions for the safety protection area of rail traffic are given.
作者 刘芳 LIU Fang
出处 《城市道桥与防洪》 2021年第7期193-197,M0017,共6页 Urban Roads Bridges & Flood Control
关键词 轨交安全保护区 叠加影响 施工控制 施工监测 safety protection area of rail traffic superimposed influence construction control construction monitoring
  • 相关文献

参考文献3

二级参考文献24

共引文献47

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部