摘要 拟建济南—滨州铁路经遥墙机场后须跨(穿)越黄河至济阳设站。跨(穿)越黄河工程是该铁路控制性工程,对项目工期、投资影响较大。本文综合考虑地质条件、既有黄河公路桥分布对铁路桥选址的影响、济阳区总体规划及济阳站设置条件、遥墙机场飞行净空及电磁环境的要求,提出了隧道下穿黄河方案、利用规划国道G308桥位方案、利用既有迎宾黄河大桥桥位方案和既有迎宾黄河大桥下游7 km桥位方案。从黄河水利委员会对跨越黄河公路和铁路桥间距的要求、黄河桥(隧)工程条件、满足遥墙机场飞行安全要求、与济阳区现状和城市规划的协调性、对环境敏感点的影响、工程投资六个方面综合比较,得出隧道下穿黄河方案最优。 The proposed Jinan-Binzhou railway will cross the Yellow River after passing through the Yaoqiang airport to new built Jiyang station.The Yellow River crossing project is a control project of the railway,which has a great impact on the project duration and investment.Considering the geological conditions,the influence of the existing Yellow River highway bridge distribution on the railway bridge site selection,the overall planning of Jiyang district and the setting conditions of Jiyang station,the flight clearance of Yaoqiang airport and the requirements of electromagnetic environment,this paper put forward the scheme of tunnel under-crossing the Yellow River,the scheme of using the planned national highway G308 bridge site,and the scheme of using existing Yingbin Yellow River bridge site and the scheme of downstream 7 km bridge site of the existing Yingbin Yellow River bridge.From the requirements of the Yellow River Water Conservancy Commission on the distance between the highway and railway bridges crossing the Yellow River,the engineering conditions of the Yellow River Bridge(Tunnel),the flight safety requirements of Yaoqiang airport,the coordination with the current situation and urban planning of Jiyang district,the impact on the environment sensitive points,and the project investment,it is concluded that the scheme of tunnel under-crossing the Yellow River is the best.
作者 李波 LI Bo(Shaanxi Railway and Underground Traffic Engineering Key Laboratory(FSDI),Xi’an 710043,China)
出处 《铁道建筑》 北大核心 2021年第7期103-106,116,共5页 Railway Engineering
基金 中铁第一勘察设计院集团有限公司科研项目(院科18-68)。
关键词 铁路选线 方案综合比选 因素分析法 跨(穿)越黄河段 防洪评价 地质条件 飞行净空 railway location comprehensive comparison and selection of schemes factor analysis crossing the Yellow River flood control evaluation geological conditions airport flight clearance
  • 相关文献

参考文献4

二级参考文献18

  • 1蔡良才,邵斌,郑汝海,种小雷.机场净空区范围确定方法[J].交通运输工程学报,2004,4(4):40-43. 被引量:25
  • 2殷红伟,黄志军,董建刚.桩基托换在广州地铁三号线中的应用[J].山西建筑,2005,31(12):91-92. 被引量:6
  • 3易思蓉.铁路选线设计[M].成都:西南交通大学出版社,2006.
  • 4铁道第四勘察设计院.铁路工程设计技术手册.站场及枢纽[M].北京:中国铁道出版社,2004.
  • 5蔡良才.机场规划设计[M].北京:解放军出版社,2002..
  • 6中华人民共和国铁道部.TB10002.1-2005铁路桥涵设计基本规范[S].北京:中国铁道出版社,2005.
  • 7中华人民共和国铁道部.TB10082-2005铁路轨道设计规范[S].北京:中国铁道出版社,2005.
  • 8中华人民共和国铁道部.铁科技[2004]78号铁路主要技术政策[S].北京:中国铁道出版社,2004.
  • 9中华人民共和国住房和城乡建设部,中华人民共和国国家质量监督检验检疫总局.GB50090-2006铁路线路设计规范[S].北京:中国计划出版社,2006.
  • 10中铁第一勘察设计院集团有限公司.新建铁路兰州至乌鲁木齐第二双线可行性研究[R].西安:中铁第一勘察设计院集团有限公司,2008.