期刊文献+

明挖无柱地铁车站底板结构优化设计研究 被引量:5

Study on Optimum Design of Floor Structure of Open-cut and Column-free Subway Station
下载PDF
导出
摘要 为研究明挖无柱地铁车站底板结构形式,依托郑州某地铁车站,该站为地下2层11m岛式站台车站,地层以黏性土及砂质土为主,通过对多种底板结构形式进行内力计算分析,并对各方案进行造价、工期、施工难度等综合比选,确定了较为合理的底板结构形式。 In order to study the structure type of the floor of a open-cut and column-free subway station, this paper relies on a subway station in Zhengzhou, which is an 11 m island-type platform station with two underground floors. The ground layer is mainly composed of cohesive and sandy soil. Through internal force calculation and analysis, and comprehensive selection of cost, construction period, construction difficulty and so on for every scheme,a more reasonable type of floor structure is determined.
作者 路顺 易领兵 姚恐龙 LU Shun;YI Lingbing;YAO Konglong(Zhengzhou Qiwei Construction Engineering Design Co.,Ltd.,Zhengzhou,Henan450000,China;Yellow River Engineering Consulting Co.,Ltd.,Zhengzhou,Henan450000,China)
出处 《施工技术》 CAS 2021年第11期129-134,共6页 Construction Technology
关键词 地铁车站 底板 优化 设计 内力计算 底纵梁 subway stations floors optimization design internal force calculation bottom longitudinal beam
  • 相关文献

参考文献6

二级参考文献24

  • 1刘明保,聂永明,乐贵平,宫剑飞,李志文,李源潮.某明挖大跨区间预应力密排框架箱形结构的抗裂控制[J].建筑科学,2012,28(S1):308-311. 被引量:3
  • 2林作忠.大跨度无柱地铁车站的建筑特点及结构选型[J].铁道勘测与设计,2004(4):89-92. 被引量:14
  • 3陆忠良,吴福海.地铁一号线衡山路车站结构设计[J].上海建设科技,1994(1):5-6. 被引量:2
  • 4中铁二院工程集团有限责任公司.深圳市地铁2号线东延线工程详细勘察阶段新秀站及站后折返线岩土工程勘察报告[R].成都:中铁二院工程集团有限责任公司,2008.
  • 5北京城建设计研究总院有限责任公司.GB50157-2003地铁设计规范[S].北京.中国计划出版社,2003.
  • 6中国建筑科学研究院.JGJ120-99建筑基坑支护技术规程[S].北京:中国建筑工业出版社,1999.
  • 7广州市地下铁道设计研究院.广州地铁二号线赤岗站初步设计,1999.11.
  • 8铁道部第二勘测设计院.广州地铁二号线市二宫站初步设计,1998.6.
  • 9铁道部第四勘测设计院.广州地铁二号线中大站初步设计,1999.11.
  • 10铁道部第四勘测设计院.广州地铁二号线鹭江站初步设计.1999.11

共引文献36

同被引文献28

引证文献5

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部