火神山、雷神山医院在设计建造过程中,面临须保障氧气可靠供应、防止病毒扩散、传统钢筋混凝土CT室养护时间不足、后期维保困难等难题,通过引进供氧系统智能化技术、空气压力梯度控制技术、医疗与生活污染废弃物处理技术、污废水处理技术、电离防护系统创新设计和维保云平台等,有效解决上述难题,并保障火神山、雷神山医院按时投入使用及后期平稳高效运行,同时实现医院运行维保期间零污染、零感染。
To design and construct Huoshenshan Hospital and Leishenshan Hospital,it is significant to guarantee the reliable supply of oxygen,preventing the virus spread,sufficient time to maintain the reinforced concrete of CT rooms,and the late maintenance.These problems were solved by introducing the following techniques including the intelligent oxygen supply system,gradient control of air pressure,treatment of medical and living waste,treatment of raw medical sewage,ionization protection system,and online maintenance platform.These techniques can ensure that the operations of Huoshenshan Hospital and Leishenshan Hospital can start on time and run smoothly and efficiently.Additionally,no pollution and no infection were guaranteed during the operation and maintenance of the hospital.
作者
马雪兵
余地华
叶建
王树峰
向文秘
MA Xuebing;YU Dihua;YE Jian;WANG Shufeng;XIANG Wenmi(General Construction Co.of CCTEB Group Co.,Ltd.,Wuhan,Hubei430064,China)
出处
《施工技术》
CAS
2021年第12期143-145,共3页
Construction Technology
基金
中建股份2020年本级科技研发计划:基于两山医院的防疫工程建设集成技术及产业化研究(CSCEC-2020-Z-06)。
关键词
医院
应急抢险
运行
维保
设计
hospitals
emergency rescue
operation
maintenance
design