摘要
贵州属于典型的山地地区,风电场建设及运营具有很强的代表性。对贵州山地地区的风资源评估、风电场的建设,以及风电场的运营维护等方面展开研究,发现目前高海拔山地地区的风力发电技术存在突出的不稳定性和间歇性问题,贵州山地地形的风电场处于高海拔地区,风电场的发电量受季节和空气密度的影响明显。提出了利用储能技术和风力发电技术结合的方法来解决高海拔山地地形的风力发电技术的不稳定性和间歇性问题,这对山地地区风力发电技术发展和能源结构形式的调整具有重要意义。
Guizhou is a typical mountainous region,and the construction and operation of wind farms is representative.The study found that wind power generation technology in the high altitude mountainous area have more prominent instability and intermittent problems by assessment of resources and operation and maintenance in Guizhou mountainous area of wind farms.Usually,wind farms in mountainous terrain in Guizhou are located at high altitudes,the power generation of wind farms and the instability and intermittent problems is more obviously affected by seasons and air density.Proposes a combination of energy storage technology and wind power technology to solve the instability and intermittent problems of wind power technology in high‐altitude mountain terrain,which is important for the development of wind power technology and the adjustment of energy structure in mountainous region.
作者
王强
张雪辉
王星
王喆
王吉
李文
蒋海军
左志涛
WANG Qiang;ZHANG Xue‐hui;WANG Xing;WANG Zhe;WANG Ji;LI Wen;JIANG Hai‐jun;ZUO Zhi‐tao(National Energy Large‐scale Physical Energy Storage Technologies R&D Center of Bijie High‐tech Industrial Development Zone,Bijie Guizhou 551700,China)
出处
《科技和产业》
2021年第7期253-259,共7页
Science Technology and Industry
基金
毕节市科技支撑计划项目(毕科合字[2017]13号)
贵州省科技计划项目(黔科合基础[2017]1164)
国家重点研发计划项目(2017YFB0903605)
贵州省科技平台及人才团队计划项目(黔科合平台人才[2017]5308)
贵州省科研机构创新能力建设专项资金项目(黔科合服企[2019]4011)
国家地方联合工程中心项目(发改办高技[2019]180号)
贵州省高新技术产业发展专项资金项目(黔发改高技[2017]951号)。
关键词
山地地区
风力发电
储能技术
mountain area
wind power generation
energy storage technology