施工企业引导EPC项目初步设计策划 被引量:1

Construction Companies Guide the Preliminary Design and Planning of EPC Projects
下载PDF
导出
摘要 EPC工程总承包合同模式不同于施工总承包,通常情况下业主不提供施工图纸,业主只对工程的功能性提出相应要求。承包商可以综合协调建筑的使用功能、结构安全、工期、成本等诸多因素,最大限度地发挥设计的主导作用,为业主提供优质服务的同时,增加自身的盈利水平。EPC项目不论何种模式,从成本造价控制角度讲,其设计阶段管控效果要远远大于采购与施工阶段。通过商务创效引导初步设计,从源头落实商务策划,锁定工程概算,降低EPC项目设计风险,加强设计前段管理,能有效地提升项目生产经营能力。 The EPC project general contract model is different from the general construction contract.Normally,the owner does not provide construction drawings,and the owner only puts forward corresponding requirements for the functionality of the project.The contractor can comprehensively coordinate the building's use function,structural safety,construction period,cost and many other factors,maximize the leading role of the design,and increase its own profitability while providing quality services to the owners.Regardless of the mode of the EPC project,from the perspective of cost control,the control effect in the design phase is far greater than the procurement and construction phase.Guide the preliminary design through business creation,implement business planning from the source,lock in project estimates,reduce EPC project design risks,strengthen design front-end management,and effectively improve project production and operation capabilities.
作者 刘炎 陈凯 王志明 刘雪峰 LIU Yan;CHEN Kai;WANG Zhi-ming;LIU Xue-feng(China Construction First Division Group Huajiang Construction Co.,Ltd.,Beijing 100161,China)
出处 《价值工程》 2021年第22期44-47,共4页 Value Engineering
关键词 EPC模式 商务策划 设计管理 初步设计 EPC model business planning design management preliminary design
  • 相关文献

参考文献1

二级参考文献2

共引文献1

同被引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部