湘江东岸钢板桩围堰施工质量提升对策研究 被引量:1

Practice and application of improving the first acceptance rate of steel sheet pile cofferdam construction quality on the East Bank of Xiangjiang River
下载PDF
导出
摘要 对长沙市湘江东岸防洪综合改造工程项目(一期第一标段)钢板桩围堰施工质量的影响因素进行分析,确定“设备性能不足”和“锁口未抹黄油混合物油膏”为主要因素,制定并实施“对设备性能要求进行计算和复核,明确具体采用的设备型号,并进行现场试打,确定最优钢板桩围堰专项施工方案”和“进行技术交底,安排专人进行抹黄油混合物油膏作业,并及时记录”的对策。结果表明,采取改进措施后提高了钢板桩围堰施工质量一次验收合格率,缩短了施工工期。 This paper analyzes the influencing factors of the construction quality of steel sheet pile cofferdam in the east bank flood control comprehensive reconstruction project of Xiangjiang River in Changsha City(the first bid section of phase I).The main factors are determined as“insufficient equipment performance”and“not smeared with butter mixture ointment at the lock”.The“calculation and review of equipment performance requirements”is formulated and implemented,and the specific equipment model is determined,and the on-site trial driving is carried out to ensure the construction quality The Countermeasures of“determining the best special construction scheme of steel sheet pile cofferdam”and“carrying out technical disclosure,arranging special personnel to carry out the operation of plastering grease mixture,and recording in time”are put forward.The results show that after the improvement measures,the first acceptance rate of steel sheet pile cofferdam construction quality is improved,and the construction period is shortened.
作者 姜赛娇 Jiang Saijiao(Hunan Bestall Water conservancy construction Co.,Ltd.,Changsha 410007 China)
出处 《水利建设与管理》 2021年第6期49-52,15,共5页 Water Conservancy Construction and Management
关键词 钢板桩围堰施工 质量验收 合格率 改进措施 Steel sheet pile cofferdam construction Quality acceptance Qualified rate Improvement measures
  • 相关文献

参考文献5

二级参考文献11

共引文献24

同被引文献7

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部