摘要 秦山核电扩建项目(方家山核电)是我国自主研发设计的百万千瓦级先进压水堆核电工程。方家山核电1号机组于自2008年12月26号正式开工建设,至2015年2月12日1号、2号机组全部投入商运,所有关键里程碑节点均按计划顺利推进,运行业绩连续创历史新高。本文从方家山核电设计建造、安装调试、运行管理和维修技术等分析,介绍方家山核电并网以来业绩登高的主要技术措施及其作用。 Qinshan Nuclear Power Expansion Project(Fangjiashan Nuclear Power Project)is an advanced 1000-MWe PWR nuclear power plant independently developed and designed by China.Fangjiashan 1 started construction officially on December 26,2008,Fangjiashan 2 was put into commercial operation on February 12,2015.From the start of construction to operation,all key milestones have been progressing smoothly as planned,and the operating performance has reached a record high.This paper analyzes the design and construction,installation and commissioning,operation management and maintenance techniques of Fangjiashan nuclear power plant,and summarizes the main technical measures for the performance of the plant since grid connection.
作者 杜阳阳 章鹏华 孙庆男 郭逸 周伟 原上草 马一鸣 沈海涛 楼昕皓 DU Yang-yang;ZHANG Peng-hua;SUN Qing-nan;GUO Yi;ZHOU Wei;YUAN Shang-cao;MA Yi-ming;SHEN Hai-tao;LOU Xin-hao(Nuclear Power Operation Management Co.,Ltd.,CNNC,Haiyan,Zhejiang Prov,314300,China)
出处 《中国核电》 2021年第3期317-321,共5页 China Nuclear Power
关键词 方家山核电 业绩 技术措施 设计建造 安装调试 运行管理 维修技术 Fangjiashan nuclear power plant the operating performance technical measures design and construction installation and commissioning operation management maintenance technology

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部