期刊文献+

高温气冷堆示范工程核应急体系开发综述

Summary of Development of the Nuclear Emergency System for the High Temperature Gas Cooled Reactor Demonstration Projecdt
下载PDF
导出
摘要 高温气冷堆示范工程技术上的特殊性和厂址多机型、多业主等特殊性决定了核应急体系开发的复杂性。本文通过对高温堆核应急体系开发过程的回顾,系统总结了该工作在策划、组织、实施、技术决策等方面的良好实践,也呈现了高温堆核应急体系的某些重要成果,为读者全面了解具有第四代核电特征的高温气冷堆核应急体系提供了重要视角,也为高温堆装料前首次场内应急综合演习创造了重要条件。 The HTR’s particularity in technology and multiple reactor types determine the complexity of our development of the nuclear emergency system.By retrospecting the development process,it aims at summarizing the good practices of the plan,organization,implementation and technology decision,and presenting some important achievements of the nuclear emergency system.The article also provides an important perspective for those who tend to learn the HTR emergency system,and lays a solid foundation for the initial emergency rehearsal before the first fuel loading.
作者 陈永行 龚兵 刘玉文 刘莹 CHEN Yong-xing;GONG Bing;LIU Yu-wen;LIU Ying(Huaneng Shandong Shidao Bay Nuclear Power Co.,Ltd.,Rongcheng,Shandong Prov.264312,China)
出处 《中国核电》 2021年第3期411-414,共4页 China Nuclear Power
关键词 高温堆 核应急体系 应急预案 开发原则 架构图 应急计划区 环境监测站 B/S架构 high temperature reactor(HTR) nuclear emergency system emergency plan development principles architecture diagram emergency plan area environmental monitoring station bowser/server structure
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部