摘要
本文以某市政钢箱梁为研究依据,从其支架的布置以及结构设计出发,对钢箱梁施工中的地基处理方案进行了探讨。并重点分析了钢梁桥合拢段施工中的控制要点及位置选取。
Based on the research of a municipal steel box girder,this paper discusses the foundation treatment scheme in the construction of steel box girder from the arrangement of its support and the structural design.On this basis,the key points of control and location selection in the construction of the closing section of steel girder bridge are analyzed.
出处
《辽宁省交通高等专科学校学报》
2021年第3期9-11,共3页
Journal of Liaoning Provincial College of Communications
关键词
市政桥梁
钢梁桥安装
合拢技术
municipal bridge
steel girder bridge installation
closed technology