石油工程造价信息化建设实践与思考——以中国石油IPM系统造价模块建设为例 被引量:3

The construction of petroleum project cost information-A case study of the cost module of CNPC's IPM system
下载PDF
导出
摘要 石油化工项目实施过程中,工程投资的编制与报审、指标定额的修编、典型工程的收集整理、投资参考指标的编制等手段比较单一,普遍存在速度慢、时间长、不规范等问题,迫切需要在信息化手段上进行提高和完善.中国石油集团建立了投资项目一体化管理系统工程造价模块,通过该信息化项目的实施,规范了石油项目WBS结构,实现了投资项目估概算的协同编审、计价依据集中管理的数字化与信息化,有力地提升了石油项目工程造价管控的信息化应用水平. In the process of petrochemical project implementation,the methods such as compilation and examination of project investment,the revision and compilation of index quota,the collection and arrangement of typical projects,and the compilation of investment reference index are relatively single.There are such problems as slow speed,long time,nonstandard,etc.,and it is urgent to improve and perfect the information methods.CNPC has set up the project cost module of the investment project integrated management system,standardized the structure of the oil project WBS through the implementation of the information project,realized the digitalization and informatization of coordination review of the estimated budget and concentrated management of the basis valuation,and improved the information application level of project cost management and control.
作者 翁中原 梁云凯 毕莎莎 WENG Zhongyuan;LIANG Yunkai;Bl Shasha(CNPC Development and Planning Department;Kunlun Digital Technology Co.,Ltd.)
出处 《国际石油经济》 2021年第7期100-105,共6页 International Petroleum Economics
关键词 工程造价 信息化 WBS结构 计价依据 project costs informatization WBS structure pricing basis
  • 相关文献

参考文献4

二级参考文献9

共引文献23

同被引文献12

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部