摘要
坑道掘进过程中,经常遇到不良地质环境的影响,对生产和安全产生严重影响,因而必须实施超前预测与预报。通过对坑道超前探测现状的分析,详细说明了现有技术的使用原理和优缺点,并进行比较。在实际生产中使用什么方法应因地制宜,多种方法相互结合。
In the process of tunnel tunneling,adverse geological environment is often encountered,which has a serious impact on production and safety.Therefore,advanced prediction and forecast must be carried out.Based on the analysis of the status quo of advanced tunnel detection,the application principle,advantages and disadvantages of the existing technology are explained in detail,and the comparison is made.What method to use in actual production should be adapted to local conditions,and many methods should be combined with each other.
作者
张卫
邱占林
ZHANG Wei;QIU Zhan-lin(Shuifa Planning&Design Co.,Ltd.,Jinan 250014,China;School of Resource Engineering,Longyan University,Longyan 364012,China)
出处
《煤炭技术》
CAS
北大核心
2021年第7期68-70,共3页
Coal Technology
基金
福建省自然科学基金面上项目(2020J01360)
福建省中青年教师教育科研项目(科技类)(JAT190759)
龙岩市科技计划项目(2019LYF13010,2018LYQM0101)。
关键词
坑道超前探测
异常地质构造
研究现状
物理性质
advanced tunnel detection
anomalous geologic structure
research actuality
physical propertie