摘要
探讨了综采放顶煤工作面设备高效率回撤稳装过程中拆除、倒运、安装、调试等工序科学衔接安排,通过正确选择最优搬运机械设备,用平行作业、填充作业、车辆调度方法和手段,结果使用时减少1/3、安装质量达标并实现安装结束即具备生产条件。
Probes into the scientific connection arrangement of the working procedure of removing,transporting,installing and debugging the equipment in the process of withdrawing and stabilizing the equipment in fully mechanized top coal caving face with high efficiency,and through selecting the optimal handling mechanical equipment correctly,with the method and means of parallel operation,filling operation and vehicle dispatching,the production condition is reached when the use is reduced by one third,the installation quality is up to the standard and the installation is finished.
作者
徐利华
XU Li-hua(Shanxi Wangjialing Coal Industry Co.,Ltd.,Xinzhou 036600,China)
出处
《煤炭技术》
CAS
北大核心
2021年第7期138-139,共2页
Coal Technology
关键词
综放工作面设备
快速回撤稳装
方法和途径
fully mechanized top-coal caving face equipment
quick withdrawal and stabilization
method and approach