依托软土地基上的建筑物纠倾工程成功案例,介绍了运用堆载法实施纠偏的全过程,并分析了纠偏的原理及效果。实践表明堆载法纠倾在工程中可行且可靠。
Taking the successful case in correcting the tilt of the building on the foundation after treatment in the soft soil as an example,the entire process of implementing the correction using stacking method is introduced,and the principle and effect of rectification are analyzed.The practice shows that the tilt-correcting of heap loading method is feasible and reliable in engineering.