结合北京门头沟区卧龙岗村滑坡综合治理工程实例,对滑坡成因进行了分析,采用了抗滑桩、预应力锚索、土体注浆等措施对滑坡进行综合治理。后期滑坡加固工程的监测结果表明,治理后边坡稳定,达成预期目标。
Combining an example of a comprehensive treatment project for a landslide in Wolonggang Village,Mentougou District,Beijing,the cause of the landslide was analyzed,and measures such as anti-slide piles,prestressed anchor cables,and soil grouting were used to comprehensively treat the landslide.The monitoring results of the later landslide reinforcement project showed that the slope was stable after treatment,and the expected goal was achieved.
作者
刘洪洋
张汇睿
毕强
张智航
Liu Hong-yang;Zhang Hui-rui;Bi Qiang;Zhang Zhi-hang
出处
《建筑技术开发》
2021年第14期144-145,共2页
Building Technology Development
关键词
滑坡
抗滑桩
锚索框架
注浆
landslide
anti-slide pile
anchor cable frame
grouting