摘要
在垃圾焚烧电厂的实际生产过程中,汽轮机真空度逐渐降低是每个发电厂都遇到过的普遍问题。文章阐述了可能导致汽轮机真空度降低的原因,并针对目前垃圾焚烧发电厂汽轮机的真空密封性问题,提出具体优化措施,为我国垃圾焚烧电厂的发展助力。
In the actual production process of waste incineration power plants,the gradual decrease in the vacuum degree of steam turbines is a common problem encountered in every power plant.The article expounds the reasons that may lead to the reduction of the vacuum degree of the steam turbine,and proposes specific optimization measures for the current vacuum tightness of the steam turbine of the waste incineration power plant,which will help the development of the waste incineration power plant in my country.
出处
《电力系统装备》
2021年第11期112-113,共2页
Electric Power System Equipment
关键词
垃圾焚烧电厂
汽轮机
严密性
waste incineration power plant
steam turbine
tightness