摘要 文中以某大桥吊装主梁架设施工所用WJQ180-40A3架桥机为研究目标,对该架桥机的纵向、横向及屈曲稳定性进行计算分析,对桁架用Midas Civil建立模型进行静力分析。分析结果表明,该大桥主梁吊装架桥机纵向、横向及屈曲稳定性良好,桁架及吊绳受力满足规范要求,并有一定的安全储备。同时,设计合理并经过Midas/Civil有限单元法验算的架桥机可靠安全,满足实际工程需要,可为类似架桥机的工程设计验算提供依据和实践经验。 The research objective of the paper is the WJQ180-40A3 bridge erecting machine used in the erection of the main girder of a bridge.The longitudinal,lateral and buckling stability of the bridge erecting machine were calculated and analyzed using the Midas Civil model of the truss with static analysis.The analysis results show that the longitudinal,transverse,and buckling stability of the bridge erecting machine for the main girder of the bridge is enough,moreover,the truss and suspension ropes meet the requirements of the code,remaining a certain safety reserve.At the same time,the design of bridge erecting machine verified by Midas/Civil finite element method is reliable and safe,which meets the actual engineering needs.The results may provide basis and practical experience for the engineering application of similar bridge erecting machines.
作者 王坤 李汉霖 杨绪彪 姜乃琛 WANG Kun;LI Hanlin;YANG Xubiao;JIANG Naichen(Bayan County Highway Development Center,Harbin 150028,China;Heilongjiang Provincial Longjian Road&Bridge the 1st Engineering Co.,Ltd.,Harbin 150028,China)
出处 《低温建筑技术》 2021年第7期96-99,共4页 Low Temperature Architecture Technology
关键词 架桥机 吊装 受力验算 有限元分析 bridge erecting machine hoisting force checking finite element analysis
  • 相关文献

参考文献4

二级参考文献9

共引文献7

同被引文献7

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部