期刊文献+

活塞连杆总成流水线装配工艺方案的分析

Analysis of the Assembly Process Plan of the Piston Connecting Rod Assembly Line
下载PDF
导出
摘要 本文以发动机装配线为例,从节拍、过程质量以及防错等方面,对某合资公司发动机工厂A、B线的活塞连杆总成装配工艺进行比较分析;同时借鉴行业内其他主机厂的装配工艺,寻求一条改进活塞连杆总成装配工艺的思路,为消除生产线的瓶颈工位提供改进的方向。 Based on the engine assembly workshop production line,the article compares and analyzes piston and connecting rod assembly process plan from the production rhythm control,assembly process quality and error proofi ng in SGMW EMD assembly shop phase 1 and 2.And at the same time with the reference from other factory assembly line,the article aims to fi nd a way to improve the route of improving the assembly process of the piston and connecting rod assembly line,so as to provide the improvement direction to eliminate the bottleneck of the whole line.
作者 梁士明 梁锋 Liang Shiming;Liang Feng
出处 《时代汽车》 2021年第16期139-140,共2页 Auto Time
关键词 流水线 装配工艺 活塞连杆总成 assembly line assembly process plan piston and connecting rod assembly

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部