期刊文献+

竖井掘砌工程主副提升机垂直布置施工技术 被引量:1

Construction Technology of Vertical Arrangement of Main Hoist and Auxiliary Hoist in Shaft Excavation Engineering
下载PDF
导出
摘要 竖井是矿山开采主要开拓方式,近年来在新建矿井中竖井开拓约占新建矿井的45%。随着矿山企业改扩建工程的施工,为了节约用地及环保需要,部分矿企因为要在原工业广场内进行改扩建工程施工,所以提供的工业场地十分有限,同时建设单位要与施工单位厂区内共同作业,迫使施工单位因地制宜,不得不对传统凿井设备对侧布置进行改造。焦家金矿寺庄矿区新建主竖井工程,受工业厂区限制,为增设双提升凿井绞车,提高工作效率,三侧方向布置凿井设备,主提升与副提升垂直布设,在国内行业中实属罕见,为日后矿建井筒快速掘砌奠定基础。 Shaft is the main way of mine exploitation,which accounts for 45%of the newly-built mines in recent years.With the construction of reconstruction and expansion projects of mining enterprises,in order to save land and protect the environment,some mining enterprises have to provide very limited industrial sites because they have to carry out reconstruction and expansion projects in the former industrial plaza,at the same time,the construction unit must work together with the construction unit in the plant area,forcing the construction unit to adapt to local conditions,had to traditional shaft sinking equipment layout on the opposite side of the transformation.The newly-built main shaft project in Sizhuang mining area of Jiaojia Gold Mine is subject to the restriction of the industrial factory area.In order to increase the working efficiency by adding a double-lift shaft sinking winch,shaft sinking equipment is arranged in three directions,and the main lift and auxiliary lift are arranged vertically,which is rare in the domestic industry,it lays a foundation for the rapid excavation and bricklaying of mine shaft in the future.
作者 许贵林 孟庆才 XU Gui-lin;MENG Qing-cai(Liaoning East Coal Capital Construction Co.,Ltd.,Shenyang 110122,China)
出处 《有色矿冶》 2021年第4期15-17,29,共4页 Non-Ferrous Mining and Metallurgy
关键词 竖井 快速掘砌 三侧布置 施工技术 shaft rapid excavation three-side layout construction technology
  • 相关文献

参考文献5

二级参考文献13

共引文献9

同被引文献7

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部