摘要
随着我国能源的快速发展,核电机组调峰降功率已成常态。调峰降功率期间,轴向功率偏差ΔI控制存在较大难度,ΔI超带事件时有发生。本文先通过Tulip程序对秦二厂CNP600机组降功率过程实际ΔI和计算ΔI的对比,验证Tulip程序对降功率过程ΔI计算的精度满足要求。然后,通过Tulip程序计算,给出更优化的ΔI控制方案。最后,考虑到实际运行操作和理论计算的差异性,研究分析了几种不同ΔI控制方案对降功率后ΔI的影响。研究结果可为秦二厂CNP600堆芯调峰降功率过程中的ΔI控制提供技术支持。
With the rapid development of energy in China,the peak-load shaving operation of nuclear power plants has become a normal state.During power reduction,the control of axial power deviationΔI is so difficult that events ofΔI deviates from operation band occur frequently.In this paper,Tulip program is verified available by the comparison between actualΔI and calculatedΔI during peak-load shaving operation of CNP600 core of QinshanⅡ.ThenΔI control strategy is optimized by Tulip.Finally,serial different control strategies ofΔI are calculated to study the influence onΔI after power decreasing operation.The study results can provide technical support forΔI control in the peak-load shaving operation of CNP600 core of QinshanⅡ.
作者
沈亚杰
高永恒
詹勇杰
刘臻
杨嗣
王澄瀚
王勇智
SHEN Ya-jie;GAO Yong-heng;ZHAN Yong-jie;LIU Zhen;YANG Si;WANG Cheng-han;WANG Yong-zhi(Nuclear Power Operation Management Co.,Ltd.,CNNP,Haiyan,Zhejiang Prov.314300,China)
出处
《中国核电》
2021年第4期577-580,594,共5页
China Nuclear Power
关键词
CNP600
降功率
轴向功率偏差
CNP600
peak-load shaving operation
axial power difference