分节预制地下连续墙在轨道交通工程中的应用

Application of Segmental Prefabricated Diaphragm Wall in Rail Transit Engineering
下载PDF
导出
摘要 结合上海轨道交通某车站附属工程,对分节预制地下连续墙设计方案、施工方案、应用效果等进行了介绍。通过引入横向接头,将单幅连续墙分为上、下两节进行预制,现场再进行装配施工,使得预制地下连续墙可以应用于更深开挖深度的基坑工程。对横向型钢接头设计方案、预制及安装过程质量控制要点等进行了详细介绍,工程监测结果表明,相关方案与措施符合施工要求,所总结的经验可供类似工程参考。 Combined with the auxiliary project of a station of Shanghai rail transit,the design scheme,construction scheme and application effect of prefabricated diaphragm wall are introduced.By introducing the transverse joint,the single diaphragm wall is divided into upper and lower segments for prefabrication,and then the assembly construction is carried out on site,so that the prefabricated diaphragm wall can be applied to the foundation pit engineering with deeper excavation depth.The design scheme of transverse section steel joint,quality control points of prefabrication and installation process are introduced in detail.The engineering monitoring results show that the relevant schemes and measures meet the construction requirements,and the summarized experience can be used as reference for similar projects.
作者 谭斌 TAN Bin(China Railway 23rd Bureau Group RailTransit Engineering Co.,Ltd.,Shanghai 201300,China)
出处 《建筑施工》 2021年第7期1232-1235,共4页 Building Construction
关键词 预制地下连续墙 分节 深基坑 横向接头 prefabricated diaphragm wall segment deep foundation pit transverse joint
  • 相关文献

参考文献12

二级参考文献26

共引文献82

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部