大型商业综合体裙房提前开业的配套移交管理

Complementary Handover Management of Large Commercial Complex Podium Opening Business in Advance
下载PDF
导出
摘要 为实现总承包管理模式下的大型商业综合体分期交付及提前移交后的配套管理,以"满足使用功能、达到使用条件、发挥其功效"为目标,建立完善的总承包管控体系,解决项目工作面大、工期紧、跨专业交叉施工复杂等难题,为类似项目的局部提前交付管理提供参考。 In order to realize the phased delivery of large commercial complex under the general contracting management mode and the complementary management after the early handover, with the goal of "meeting the use function, achieving the use conditions and giving full play to its effectiveness", a perfect general contracting management and control system is established to solve the problems of large project working face, tight construction period and complex cross professional construction, and to provide a reference for the local early delivery management of similar projects.
作者 伍山雄 阚晓宇 朱敏慧 杨艳权 薛伟 汪刚 WU Shanxiong;KAN Xiaoyu;ZHU Minhui;YANG Yanquan;XUE Wei;WANG Gang(China Construction Third Engineering Bureau Group Co.,Ltd.(Shanghai),Shanghai 200129,China)
出处 《建筑施工》 2021年第7期1413-1414,共2页 Building Construction
关键词 提前交付 移交 大型商业综合体 总承包管理 delivery in advance handover large commercial complex general contracting management
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部