TBM滚刀破碎节理岩体效率分析及刀间距优化方法研究 被引量:1

Analysis of Efficiency of Hob Crushing Jointed Rock Mass and Research on the Optimization Method of Knife Spacing
下载PDF
导出
摘要 在全断面隧道掘进机(TBM)开挖隧道过程中,常遇到节理岩体。为了研究不同刀间距下的滚刀破岩效率,对刀间距进行优化,对不同节理间距和节理情况岩体开展二维滚刀贯入试验。试验中,节理倾角设为0°、30°、45°、60°、90°,节理间距设为30mm、40mm、50mm、60mm、70mm,滚刀间距S设为60mm、80mm、100mm、120mm。试验结果表明:当节理倾角为60°时,破岩效率最高;随着刀间距的增加,破岩效率逐渐降低;不同节理条件下,刀间距为100mm,滚刀的破岩效率均达到了最优,最佳s/p值约为10。 In the tunnel excavation process by a full-face tunnel boring machine(TBM),jointed rock masses are often encountered.In order to study the rock-breaking efficiency of the hob under different cutter spacing,the cutter spacing was optimized,and the two-dimensional hob penetration test was carried out on the rock mass with different joint spacing and joint conditions.In the test,the joint inclination angles were set to 0°,30°,45°,60°,90°,the joint spacing was set to 30mm,40mm,50mm,60mm,70mm,and the hob spacing S was set to 60mm,80mm,100mm,120mm.The test results showed that:when the joint dip is 60°,the rock breaking efficiency is the highest;With the increase of the cutter spacing,the rock-breaking efficiency gradually decreases;under different joint conditions,when the cutter spacing is 100mm,the rock-breaking efficiency of the hob is optimal,and the best s/p value is about 10.
作者 刘国强 刘彬 张庆明 刘勃龙 Liu Guoqiang;Liu Bin;Zhang Qingming;Liu Bolong
出处 《重庆建筑》 2021年第8期33-35,共3页 Chongqing Architecture
关键词 全断面隧道掘进机 节理岩体 刀间距 破岩效率 full-face tunnel boring machine jointed rock mass cutter spacing rock-breaking efficiency
  • 相关文献

参考文献9

二级参考文献96

共引文献204

同被引文献22

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部