期刊文献+

浅谈京沪高速改扩建工程中钢箱梁分块及预拱度控制分析研究 被引量:2

Analysis and research on partition of steel box girder and camber control in reconstruction and extension project of beijing shanghai expressway
下载PDF
导出
摘要 随着新材料、新工艺的发展,钢结构桥梁在高速公路建设过程中逐步开始应用,钢结构桥梁具有跨径大、自重轻、施工速度快、便于后期维修保养等优点。本文通过对钢结构分块进一步研究分析其预拱度的控制,精确指导钢箱梁的厂内加工和现场的安装施工,更好的控制钢箱梁的施工质量。 With the gradual development of new materials and new technology,steel structure bridge is gradually applied in the process of highway construction.Steel structure bridge has the advantages of large span,light weight,fast construction speed,convenient for later maintenance and so on.In this paper,through the study of steel structure block,further analysis of the control of its camber is provided so as to accurately guide the steel box girder factory processing and on-site installation construction,better control the construction quality of steel box girder.
作者 单双龙 SHAN Shuanglong(Jiangsu Zhenjiang road and Bridge Engineering Co.,Ltd.,Zhenjiang 212017,China)
出处 《中国高新科技》 2021年第12期75-76,共2页
关键词 钢结构 分块 预拱度 Steel Structure Partition pre camber
  • 相关文献

同被引文献7

引证文献2

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部