期刊文献+

云桂铁路平安牵引变电所无功补偿方案及容量计算 被引量:1

Reactive Power Compensation Scheme and Capacity Calculation of Ping An Traction Substation of Yunnan-Guangxi Railway
下载PDF
导出
摘要 云桂铁路开通运营初期,平安牵引变电所功率因数处于长时间偏低状态,运营单位由此受到高额调整电费罚款,因此对其采取合理的无功补偿措施迫在眉睫。本文着重对可控硅相控电抗器(TCR)、磁控电抗器(MCR)和静态无功发生器(SVG)进行技术经济比选,并推荐采用MCR。利用电力部门提供的用电情况报表,结合云桂铁路既有运行情况,计算MCR的无功补偿容量,并投入运行,这也是西南地区高速铁路首次采用MCR的无功补偿方案。根据MCR投运后功率因数的跟踪统计值,验证该无功补偿方案及容量计算的正确性,为云桂铁路的运营节省电费开支。 At the initial stage after putting into operation of Yunnan-Guangxi railway,the power factor of Ping An traction substation is in a low state for a long time,and the operating company has been fined for high electricity tariffs.Therefore,it is urgent to take adequate measures for compensation of reaction power.This paper focuses on the technical and economic comparison of thyristor phase-controlled reactor(TCR),magnetically controlled reactors(MCR)and static var generator(SVG),and recommends MCR.Using the electricity consumption report provided by the power department,combined with the existing operation of the Yunnan-Guangxi railway,the compensation capacity of MCR is calculated and put into operation,this is also the first time that high-speed railways in Southwest China have adopted MCR reactive power compensation scheme.According to the tracking statistics of power factor after the MCR is put into operation,the correctness of reactive power compensation scheme and capacity calculation is verified,it is able to save electricity costs for operation of Yunnan-Guangxi railway.
作者 杨雪凇 黄文 李剑 YANG Xuesong;HUANG Wen;LI Jian
出处 《电气化铁道》 2021年第4期29-32,37,共5页 Electric Railway
关键词 云桂铁路 功率因数 磁控电抗器 容量计算 Yunnan-Guangxi railway power factor MCR capacity calculation
  • 相关文献

参考文献7

二级参考文献32

共引文献28

同被引文献2

引证文献1

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部