期刊文献+

高速铁路供电远动系统联调联试及预防性试验建议 被引量:1

Proposals on Integrated Commissioning and Preventive Test for Power Supply Remote Control System of High-speed Railway
下载PDF
导出
摘要 供电远动系统是高速铁路供电系统的重要组成部分。本文介绍了高速铁路供电远动系统联调联试的基本情况,总结了联调联试过程中发现的常见问题及解决方法,结合发现的问题对远动系统的调试提出了建议,并对运营中远动系统预防性试验给出了相关注意事项。 Power supply remote control system is an important part of power supply system of high-speed railway.The paper introduces some basic situations of integrated commissioning of power supply remote control system of high-speed railway,summarizes the common problems presented in commissioning of remote control system and the solving methods,puts forward proposals for the commissioning with connection to the presented problems,and proposes related precautions for preventive tests of remote control system in operation.
作者 赵伯胜 ZHAO Bosheng
出处 《电气化铁道》 2021年第4期53-56,共4页 Electric Railway
基金 中国国家铁路集团有限公司科技研究开发计划(N2019G019)。
关键词 高速铁路 供电远动系统 联调联试 预防性试验 high-speed railway power supply remote control system integrated commissioning preventive test
  • 相关文献

同被引文献6

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部