期刊文献+

世界交通沉管隧道工程建造情况与我国沉管科技发展现状 被引量:9

Construction of immersed tunnel engineering in the world and development status of immersed tunnel technology in China
下载PDF
导出
摘要 收集、汇总并分析了国内外已有的143条交通沉管隧道数据,从沉管隧道工程的建造数量、建造长度、建设速度及建设难度等方面,对世界沉管隧道工程建造情况进行了分析,并基于可量化的管节体量、管节数量、水深和埋深指标,首次提出了沉管隧道建设难度评价公式。最后,从专著、专利及论文数量角度出发,剖析并评价了国内沉管隧道科技发展现状。 In this paper,we collected,summarized,and analyzed the available data of 143 transportation immersed tunnels at home and abroad,and analyzed the current state of the immersed tunnel engineering in the world from the aspects of construction quantity,construction length,construction speed and construction difficulty.Based on the quantifiable indexes of tube volume,tube number,water depth and buried depth,the evaluation formula of construction difficulty of immersed tunnel was put forward for the first time.Finally,based on the number of monographs,patents and papers,we analyzed and evaluated the scientific and technological development status of immersed tunnel in China.
作者 刘凌锋 林巍 尹海卿 刘亚平 邹威 许思妍 纪宇诺 LIU Ling-feng;LIN Wei;YIN Hai-qing;LIU Ya-ping;ZOU Wei;XU Si-yan;JI Yu-nuo(CCCC Highway Consultants Co.,Ltd.,Beijing 100088,China;CCCC Third Harbor Engineering Co.,Ltd.,Shanghai 200032,China;CCCC First Harbor Engineering Co.,Ltd.,Tianjin 300461,China;Beijing Normal University,Zhuhai,Zhuhai,Guangdong 519087,China)
出处 《中国港湾建设》 2021年第8期71-79,共9页 China Harbour Engineering
关键词 沉管隧道 建造数量 建造长度 建设速度 建设难度 管节体量 管节数量 水深 埋深 科技发展 immersed tunnel construction quantity construction length construction speed construction difficulty tube volume tube number water depth buried depth scientific and technological development
  • 相关文献

参考文献10

二级参考文献472

共引文献643

同被引文献84

引证文献9

二级引证文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部