暗挖大断面隧道下穿高压燃气管线沉降变形分析与管线保护措施 被引量:3

ANALYSIS OF SETTLEMENT AND DEFORMATION OF UNDERGROUND EXCAVATED LARGE CROSS-SECTION TUNNEL PASSING HIGH PRESSURE GAS PIPELINE AND PIPELINE PROTECTION MEASURES
下载PDF
导出
摘要 北京地铁17号线望京西站-勇士营站区间暗挖横通道下穿2条高压燃气管,施工中根据现场监测结果,分析在富水敏感地层中暗挖大断面隧道施工对燃气管线的影响,对沉降超标的管线采取隔离措施进行2次保护,确保了大断面隧道顺利穿越燃气管线。 Two high-pressure gas pipes passes underneath the underground excavated cross passage between Wangjingxi Station and Yongshiying Station of Beijing Metro Line 17.According to on-site monitoring results,impact of construction of undergound excavated large cross section tunnel in the water-rich sensitive stratum on the gas pipeline is analyzed,isolation measures for secondary protection of pipelines with excessive settlement are taken to ensure the large cross-section tunnel passes through the gas pipeline smoothly.
作者 尹伟 YIN Wei(Beijing Construction Engineering Group Co.,Ltd.,100055,Beijing,China)
出处 《建筑技术》 2021年第8期926-930,共5页 Architecture Technology
关键词 大断面下穿管线 地表沉降 管线变形 现场监测 large cross-section underpass pipeline surface settlement pipeline deformation on-site monitoring
  • 相关文献

同被引文献17

引证文献3

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部