期刊文献+

马脊梁选煤厂原煤系统技术改造 被引量:1

Technical Transformation of Raw Coal System in Majiliang Coal Preparation Plant
下载PDF
导出
摘要 马脊梁选煤厂原煤系统设计生产能力为6.0 Mt/a,不能满足扩能改造达到10.0 Mt/a的生产能力。在选煤厂现有原煤系统基础上新增6.0 Mt/a的原煤准备系统,生产中甩开缓冲仓及给料机,新建201带式输送机及栈桥,将201带式输送机角度由18°调整到13.18°。201带式输送机采用驱动热备用,变频驱动,准备车间采用双系统设置。改造后生产能力提高到12.0 Mt/a,满足矿井生产的需求,降低了生产维护工作强度,提高了生产可靠性。 The designed production capacity of raw coal system in Majiliang Coal Preparation Plant is 6.0 Mt/a,which can not meet the production capacity of 10.0 Mt/a after capacity expansion.On the basis of the existing raw coal system in the coal preparation plant,a 6.0 Mt/a raw coal preparation system is added.In production,the buffer bin and feeder are thrown away,201 belt conveyor and trestle are built,and the angle of 201 belt conveyor is adjusted from 18°to 13.18°.201 belt conveyor adopts drive hot standby and frequency conversion drive,and preparation workshop adopts dual system setting.After the transformation,the production capacity is increased to 12.0 Mt/a,which meets the demand of mine production,reduces the intensity of production and maintenance,and improves the production reliability.
作者 贺少波 HE Shaobo(Coal Washing Branch Company,Jinneng Holding Coal Industry Group,Datong 037001,Shanxi,China)
出处 《能源与节能》 2021年第8期151-152,201,共3页 Energy and Energy Conservation
关键词 选煤厂 带式输送机 角度 变频驱动 coal preparation plant belt conveyor angle variable frequency drive
  • 相关文献

同被引文献6

引证文献1

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部