赵口引黄灌区二期工程进度控制措施 被引量:1

Progress Control Measures of the Second Phase Project of Zhaokou Yellow River Diversion Irrigation District
原文传递
导出
摘要 河南省赵口引黄灌区二期工程,是全国172项节水供水重大水利工程之一,也是河南省实施"四水同治"开工建设的十大水利工程之一,建设意义重大,同时工程建设时间紧、任务重,更有不同于以往水利基建项目的特殊因素。为按期完成建设任务,从目前进度推进中存在的主要问题切入,全面分析了工程建设进度的影响因素,主要包括移民征迁、大气污染管控、农业灌溉、冬雨季、劳务用工等,针对存在问题和影响因素,通过研判,提出了加快工程建设的措施和方法,以便圆满完成工程建设任务。 Phase Ⅱ Project of Zhaokou Yellow River Diversion Irrigation Zone is one of the 172 major water conservancy projects for saving and supplying water in China,The project is also one of the top 10 implementation water conservancy projects of Sishuitongzhi Project in Henan Province.Under the condition of tight construction schedule and heavy task,not to mention the special factors different from the previous water conservancy infrastructure projects,this project is of great significance. To finish the construction task on schedule,the main exsiting problems in the current progress are explained and the influence factors of the construction progress are analyzed in this article,which mainly includes immigrants,air pollution control,agricultural irrigation management,winter monsoon,labor employment and so on. In view of the problems and influence factors,practical measures and methods to speed up the project construction is propoesd,so as to accomplish the construction tasks successfully.
作者 崔宏艳 CUI Hongyan(Eastern Henan Province Water Conservancy Project Administration,Kaifeng 475000,China)
出处 《河南水利与南水北调》 2021年第4期49-50,共2页 Henan Water Resources & South-to-North Water Diversion
关键词 工程 进度 控制 project schedule control
  • 相关文献

参考文献1

同被引文献29

引证文献1

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部