摘要
在水利工程改造过程中,做好投资估算和经济评价关乎工程是否能够顺利实施。文章以新疆库车跃进总干渠改造工程为例,对工程概况和干渠总体布置、设计情况进行了阐述,并对工程效益进行分析,利用"分摊系数法"求得项目实施后其效益可达937.48万元,且最终通过国民经济评价和敏感性分析。
In the process of water conservancy project reconstruction,good investment estimation and economic evaluation are related to whether the project can be implemented smoothly. Taking the reconstruction project of the Kuqa Yuejin main canal in Xinjiang as an example,the general situation of the project,the overall layout and design of the main canal,and the engineering benefits are expounded and analyzed in this paper. Using"Apportion Coefficient Method",it is found that the benefit of the project after implementation can reach 9.3748 million yuan finally pass the national economic evaluation and sensitivity analysis.
作者
范雯婷
FAN Wenting(Xinjiang Water Resources and Hydropower Survey and Design Institute,Ministry of Water Resources,Urumqi 830000,China)
出处
《河南水利与南水北调》
2021年第4期71-72,75,共3页
Henan Water Resources & South-to-North Water Diversion
关键词
干渠
改造工程
投资估算
工程效益
国民经济评价
敏感性分析
main canal
reconstruction project
investment estimation
engineering benefit
national economic evaluation
sensitivity analysis