期刊文献+

探究建筑工程中超长结构后浇带的施工技术 被引量:7

Exploration of Construction Technology of Super Long Structure Post Pouring Belt in Construction Engineering
下载PDF
导出
摘要 近年来,我国建筑工程行业不断发展,目前已经进入全新阶段。在建筑工程中,超长结构后浇带结构具有一定特殊性,其整体施工难度较大,所以必须采用科学施工技术,促进建筑工程整体施工质量的提高。因此,论文对建筑工程中超长结构后浇带施工技术进行深入研究与分析,并提出一些合理意见和措施,旨在进一步促进我国建筑工程超长结构后浇带施工技术水平的提高。 In recent years,China's construction industry has been developing,and has entered a new stage.In the construction engineering,the super long structure post cast belt structure has certain particularity,its overall construction is difficult,so we must adopt scientific construction technology to promote the overall construction quality of construction engineering.Therefore,the paper carries out in-depth research and analysis on the construction technology of super long structure post cast strip in construction engineering,and puts forward some reasonable opinions and measures,in order to further promote the improvement of super long structure post cast strip construction technology level of China's construction engineering.
作者 杜旭峰 于磊 DU Xu-feng;YU Lei(Yanjian Group Co.Ltd.,Yantai 264000,China;The 17th Construction and Installation Co.Ltd.of Yanjian Group,Yantai 264000,China)
出处 《工程建设与设计》 2021年第15期108-110,共3页 Construction & Design for Engineering
关键词 建筑工程 超长结构后浇带 施工技术 施工难点 优化措施 construction engineering super long structure post cast strip construction technology construction difficulty optimization measure
  • 相关文献

参考文献2

共引文献13

同被引文献23

引证文献7

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部