以桑给巴尔国际机场3号航站楼工程为案例,探讨直立锁边系统铝镁锰复合金属板屋面施工工艺原理,并结合工程概况,提出直立锁边系统铝镁锰复合金属板屋面施工中的控制要点,为相关施工单位及施工人员提供一定参考。论文重点讨论在金属板屋面施工前以及施工中的控制要点,旨在促使该施工工艺得到更广泛、高效的推广与应用。
This paper takes Sangjibar International Airport Project as a case,discusses the construction process principle of aluminum-magnesium and manganese composite metal sheet roof,and combines the overview of the project,puts forward the key points of control in the construction of aluminum,magnesium and manganese composite metal sheet roofing with vertical locking system,to provide some reference for relevant construction units and construction personnel.The article focuses on the control points before the construction of the metal plate roof,and promotes the broader and efficient popularization and application of the construction technology.
作者
张九成
ZHANG Jiu-cheng(Beijing Construction Engineering International Construction Engineering Co.Ltd.,Beijing 100032,China)
出处
《工程建设与设计》
2021年第15期164-166,196,共4页
Construction & Design for Engineering
关键词
铝镁锰复合金属板
屋面
施工控制
要点
aluminum magnesium and manganese composite metal plate
roof
construction control
key points