摘要 鉴于当前110 kV高压输变电线路勘测、顶管穿越、线路敷设以及附件安装的技术较为复杂,危险性较高且施工过程容易受外界因素干扰,所以在实际施工中不仅要对其技术要点进行把控,更要做好施工质量管理等相关工作。文章从110 kV高压输变电线路的施工技术要点与特点出发,分析了当前高压输变电线路施工存在施工人员技术水平偏低、组织设计不当以及施工技术把控不足的现状,进而从基础施工技术管理、接地装置施工技术管理以及线路敷设方法3个方面探讨了施工质量管理策略。 Given the current 110 kV high-voltage transmission line survey,the top tube crossing,line laying,and the installation of the attachment are more complicated.The dangerous is high and the construction process is prone to external factors.Therefore,it is necessary to carry out its technical points in the actual construction.Control,but also do a good job in construction quality management.The article has been analyzed from the construction technology main points and characteristics of 110 kV high-voltage transmission line.The current situation of current high-voltage transmission line construction has low technical level,misconduct and insufficient organizational design,and then from the basic construction technology.The three aspects of management,grounding device construction technology and line laying methods discussed its construction quality pipeline.
作者 李焱 曹立峰 李海南 Li Yan;Cao Li-feng;Li Hai-nan
出处 《电力系统装备》 2021年第15期68-69,共2页 Electric Power System Equipment
关键词 110 kV 高压输变电线路 施工技术 110 kV high voltage transmission and transformation lines construction technique
  • 相关文献

参考文献4

二级参考文献8

共引文献11

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部