摘要
随着350 MW超临界循环流化床锅炉的试运投产,其在调试过程中出现了一些异常现象,对首批350 MW超临界循环流化床锅炉调试中出现的返料器振动进行了分析,并经过运行调整解决了返料器振动问题,目前机组运行正常。
With the commissioning of the 350 MW supercritical circulating fluidized bed boiler,some abnormal phenomena appeared during the commissioning process.The article examines the vibration of the returner during the commissioning of the first batch of 350 MW supercritical circulating fluidized bed boilers.After analysis and operation adjustment,the vibration problem of the returner has been solved,and the unit is currently operating normally.
出处
《电力系统装备》
2021年第15期140-141,共2页
Electric Power System Equipment
关键词
超临界循环流化床锅炉
返料器
循环灰量
风量
supercritical circulating fluidized bed boiler
returner
circulating ash volume
air volume