摘要 以银川—西安高速铁路贾塬隧道穿越地层接触带为工程背景,采用模型试验的方法探究了不同开挖工法和支护参数下隧道围岩位移、初期支护与围岩间的接触压力、钢拱架应力的变化规律,并通过现场监控测量数据验证了模型试验的可靠性。研究结果表明:隧道穿越红黏土与砂岩夹泥岩接触带地层时,拱顶和拱肩处的围岩变形及支护受力较大;三种开挖工法中,三台阶预留核心土法对围岩位移限制效果最好,支护受力更加均匀;钢拱架间距相比初期支护厚度对围岩位移和结构受力的影响有限。 Taking the Jiayuan tunnel of Yinchuan-Xi’an high speed railway passing through the contact zone of stratum as the engineering background,the variation laws of tunnel surrounding rock displacement,contact pressure between initial support and surrounding rock,the stress of steel arch stress under different excavation methods and support parameters were explored by using the method of model test,and the reliability of model test was verified by field monitoring and measurement data.The results show that when the tunnel passes through the contact zone stratum between red clay and sandstone with mudstone,the surrounding rock deformation and support stress at the vault and abutment are large.Among the three excavation methods,the three-step reserve core soil method has the best effect on limiting the displacement of surrounding rock and the support stress is more uniform.Compared with the initial support thickness,the steel arch frame spacing has limited influence on the displacement of surrounding rock and the stress of structure.
作者 杨文波 王宗学 张航 蒋雅君 YANG Wenbo;WANG Zongxue;ZHANG Hang;JIANG Yajun(School of Civil Engineering,Southwest Jiaotong University,Chengdu 610031,China)
出处 《铁道建筑》 北大核心 2021年第8期59-63,87,共6页 Railway Engineering
关键词 铁路隧道 开挖支护体系 模型试验 接触带 围岩变形 接触压力 钢拱架应力 railway tunnel excavation support system model test contact zone rock deformation contact pressure stress of steel arch frame
  • 相关文献

参考文献7

二级参考文献60

共引文献49

同被引文献55

引证文献4

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部