大西沟管道引水工程设计方案 被引量:1

Design scheme of Daxigou pipeline diversion project
下载PDF
导出
摘要 大西沟引水管道总水头落差大、距离长、单级静水压力大、消能阀上、下游压差大、冬季气温低、上游河道总输砂量大、压力分区多,致使输水系统联动复杂,设计难点比较突出。本文针对以上设计难点分别提出了设计方案。 Daxigou diversion pipeline is characterized by large total head drop,long distance,high single-stage hy⁃drostatic pressure,large pressure difference between upstream and downstream of energy dissipation valve,low tem⁃perature in winter,large total sand transport in upstream river,many pressure zones leading to complicated linkage of water transmission system.Design scheme is put forward in view of the above mentioned design difficulties.
作者 张玲 ZHANG Ling(Xinjiang Water Conservancy and Hydropower Survey,Design and Research Institute,Urumqi 830000,China)
出处 《广西水利水电》 2021年第4期51-53,共3页 Guangxi Water Resources & Hydropower Engineering
关键词 总水头落差大 单级静水压力大 上、下游压差 设计难点 Large total head drop high single-stage hydrostatic pressure pressure difference between upstream and downstream design difficulty
  • 相关文献

参考文献1

共引文献9

同被引文献5

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部