期刊文献+

云南电力发展存在问题与未来新型电力系统发展建议 被引量:4

Problems inYunnan Electric Power Development and suggestions for future development and of new electric power system
下载PDF
导出
摘要 截至2020年底,云南电源装机已超过1亿千瓦,以水电为主的电源结构存在与省内用电负荷不匹配的固有矛盾,同时云南电力供需不平衡问题比较突出,随着全国碳中和目标的进一步推进以及新型电力系统的构建,在大力推进新能源建设的同时,结合云南电力发展存在问题,建议加强系统调节能力建设,提高系统对新能源的接纳能力,省内省外市场协调发展,重视电源建设与产业协调发展。 By the end of 2020,the installed power supply in Yunnan had exceeded 100 million kilowatts.The power supply structure,which is mainly composed of hydropower,has an inherent contradiction of mismatch with the power load used in the province.At the same time,the imbalance between power supply and demand in Yunnan is quite prominent,with the further promotion of the national carbon-neutral target and the construction of a new type of power system,while vigorously promoting the construction of new energy sources,and taking into account the existing problems in Yunnan’s power development,it is proposed to strengthen the capacity building of system regulation,improve the system to accept the capacity of energy,provincial and provincial market coordinated development,pay attention to power construction and industrial coordinated development.
作者 刘娟 张秀钊 王志敏 刘民伟 王凌谊 赵爽 Liu Juan;Zhang Xiuzhao;Wang Zhimin;Liu Minwei;Wang Lingyi;Zhao Shuang(Center of Power Grid Planning and constructing,Yunnan Power Grid Ltd.,Kunming 650011,China)
出处 《云南电力技术》 2021年第4期2-5,共4页 Yunnan Electric Power
关键词 新型电力系统 电源发展 发展建议 new power system Yunnan Power Development suggestions for the future development of power supply
  • 相关文献

参考文献3

二级参考文献14

共引文献5

同被引文献51

引证文献4

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部